Phase II ends and Phase III begins

Some pictures from the prep work for Phase 3 North Island Taranaki Basin ops, covering Cheal, Cardiff and Sidewinder.

Temporary pipe work at Cheal-BH-1—already our best well at Cheal—waiting on 225m of perfs.

Temporary pipe work at Cheal-BH-1—already our best well at Cheal—waiting on 225m of perfs.


The old Cardiff 2A wellhead. Doesn’t look like much but there's gas down there.

The old Cardiff 2A wellhead. Doesn’t look like much but there’s gas down there.


InterDrill rig at Sidewinder, ready to drill 3 more 25m conductor holes: Sidewinder-2, 3, and possibly 4

InterDrill rig at Sidewinder, ready to drill 3 more 25m conductor holes: Sidewinder-2, 3, and possibly 4